| Item | Details |
|---|---|
| Construction | Formed sheet-metal crate clip with stepped gripping profile |
| Finish | Powder coating |
| Colors shown | Blue and yellow |
| Order quantity | Minimum 500 pieces |
| Dimensions and panel thickness | Confirm from the selected profile drawing and box-joint sample |
| Material grade and heat treatment | Confirmed for the selected design in the quotation |
| Production lead time | 20-35 days; confirm the schedule with the order |